Loading Bay 3-5 and 5-7 Build Conditions

These conditions apply to all Outdoor Stands located in Loading Bays 3–5 and 5–7. 

Loading Bays 3–5 and 5–7 are Quiet Zones.

All build activity must take place between 08:00 and 21:00. Late work will not be permitted under any circumstances.

On Thursday, dismantling in these areas is permitted between 18:00 and 21:00 only and should focus on the removal of lighter elements, such as furniture, audiovisual equipment and decorative items. No dismantling activity is permitted after 21:00.

From Friday onwards, dismantling must take place within the standard dismantling hours. 

Complex build activity within Loading Bay 5–7 is not permitted.

Within Loading Bay 5–7, Exhibitors must adopt a simple build approach that minimises on-site construction time and disruption. Structural elements should be prefabricated off-site and brought to the Venue for positioning and finishing only. Modular or semi-modular structures are strongly encouraged to reduce the complexity of the build and allow for rapid installation.