Complex Stands/Structures

Complex Structures include:

  • Stands above 4m in height (from the hall floor to the highest element of the stand, this includes the height of any platform or other floor elements)
  • Multi-storey stands
  • Platforms and stages over 500mm in height
  • Temporary tiered seatings
  • Sound or lighting towers
  • All rigged structures will require Abraxys Third Party Sign off

All Complex Stands/Structures require structural engineer sign off at stand plan submission stage.  See the Stand Plan Submission pages for more information