Electricity

Venue Exclusive Service Provider: Servifira

Early Bird Discount: 15 January 2027

Power is included with some stand packages, please click here to view the stand packages and confirm the power included.

  • If you need additional power during build-up or event days, please order an additional electrical switchboard through the the Fira Store.
  • Should you need power during dismantling please contact Servifira to check if this is feasible.
  • Click here for information on switchboard operating times.
Important
  • Please click here to read the Electrical Safety Rules before ordering additional electrical switchboards.
  • If you are building a Double Deck Stand and require electricity on the upper level please contact Servifira in order to make sure that the cables reach up to the required location.
  • A limited number of UPS's (Uninterruptible Power Supply) are available from Servifira to protect your equipment in the event of a temporary power cut, please contact Servifira for more information and prices.
  • Orders of additional power will be installed with a separate switchboard. Hence, if you need a 24-hour power supply you will have two different switchboards. Each switchboard will be clearly labelled to distinguish between daytime and 24h supplies.
  • It is compulsory for any additional switchboards ordered to show a location in the online plan provided during the ordering process.
Please note

Please note that at Fira Gran Via power is provided to stand spaces via floor traps which house service supplies. It is possible that power cables may be fed via your stand area to other stands. In this case you may be required to build a platform in your stand.

Please consult the technical floorplan of your stand space to confirm if a mandatory platform is required.

Conditions for hiring electricity via Servifira
  • Exhibitors who require additional electrical panels must place their order through the Fira Store.
  • Electrical switchboard rental prices include power supply, taxes and legal clearance.
  • In all cases, only the supply of products and services ordered within the indicated deadline is guaranteed.
  • When ordering electricity through the Fira Store you will be prompted to mark electricity points on a plan of your stand area.
  • Electricity consumption tariffs are open to any possible official variations that may occur.
  • Electrical Projects are compulsory for all the orders including switchboards above 50 kW or when all switchboards on the same stand sum up to more than 50 kW. 
  • In accordance with Spanish law, ordering 50 kW or more will activate a mandatory Electrical Assessment which will incurr a fee. For more information please contact Servifira.
  • For those exhibitors or stand builders that require 3 phase electrical panels or large amounts of kW during the build-up and dismantling, please contact Servifira to request a quote.
  • Payment methods: according to the Fira Store's General Conditions all services must be paid before build-up.
  • All reports of material tests must be issued by an authorised laboratory and/or fireproofing certificates must be drawn up by a duly approved company.

Please note that by clicking on the link you will be redirected to a third party Event Vendor’s website. GSMA shall have no liability for payment, and the service requested will be directly provided by, invoiced by, and payable to, the Event Vendor. The Company should enquire as to the rates at which the services will be invoiced and any applicable Event Vendor Terms of Services for agreement prior to any order being concluded.