In all stand-building cases (especially steelwork erection and lifting), the foreman and / or the principal contractor should draw up a specific method statement and go through it with your contractors in advance of the event.
Rules & Regulations
Method Statement
Definition
A method statement describes in a logical sequence how a job is to be carried out in a safe manner and without risks to health. It includes risks identified in the risk assessment and will elaborate with a detailed, step-by-step written description of how the work will be undertaken in a safe and controlled manner.


